Houses up to 70 sq m without a permit. What conditions must be met? - Hornval - offers interesting and original solutions for your home or company.

Houses up to 70 sq m without a permit. What conditions must be met?

Changes related to the entry into force of the so-called Polski Ład include the possibility of erecting residential buildings without the need to apply for permits. What conditions must be met to build houses up to 70 sq m without a permit? Find out more in today’s article!

What house can be built in Poland without a permit?

At the outset, it is worth answering the basic question, what house without a permit can be built in Poland. In our country, from January 3, 2022, it is possible to erect buildings for residential purposes, the total area of which may not exceed 70m2. Buildings in this category can only be used for private purposes – they cannot be sold or rented. In addition to the number of meters for a house without a permit, it is worth keeping in mind that it cannot have more than two storeys.

What conditions must be met to build a house of 70 m2 without a permit?

Another important question that bothers private investors is what conditions must be met in order to build a 70 m2 house without a permit. How many houses without a permit can be built on a plot? It turns out that not that many – on an area of 500 m2 it is possible to build a maximum of one residential building up to 70 sq m. The structure of the buildings should be simple and meet the applicable safety requirements. It is worth adding that the construction site should be the exclusive property of a private investor.

An important aspect consists also in the height of a house without a permit that was allowed by the legislator. It turns out that no limit has been set for a house without a permit up to 70 m2. Since the so-called Polski Ład made it possible to erect such buildings, the sum of the areas in relation to all dimensions of a building became important. Interiors with the height of less than 1.4 m are ignored in the calculations, those in the range of 1.4-2.2 m are included in 50%, and those above 2 m are included in 100%.

Why is it worth building a house without a permit up to 70 sq m?

Many customers taking advantage of Hornval ‘s offer wonder why it is worth building a house without a permit up to 70 m2. Is constructing such buildings profitable? Below you can find some positive aspects for choosing to build a house without a permit!

  • Low price – the total construction costs may be PLN 150,000.
  • No formalities – no need for permits reduces the construction time.
  • Freedom – the legislator does not limit investors in terms of construction technology.

It is not uncommon for small investors to consider how much can be added to a house without a permit that already exists. According to the current regulations, one should just fit in the square footage of 70 m2 and not exceed the density of – one house without a permit for 500 m2.

Build a house without a permit with Hornval roofing!

No need to prepare extensive documentation or hire a construction manager constitute some of the many advantages of houses without a permit up to 70 m2. If you plan to construct such a building and you are looking for a reliable supplier of roofing elements, then build a house without a permit with Hornval roofing material!